History
Certified ISO 9001, 14001, 27001, 45001
Certified ECM (Entities in Charge of Maintenance)
Certified EN 15085-2 Welding of Railway Vehicles
2 x 08-4X4 Tampers
Celebration of 60 years in UK
8 x 09-4X4/4S Tampers
CROSSRAIL Maintenance
System Comprising:
Power Car Type-A
2 x Power Car Type-B
2 x Transport Wagon
Power Car Type-E
Measuring Wagon
ISO 9001 and ISO 18001
Enhanced program of energy monitoring and analysis, resulting in a 40% reduction in usage of Gas and Electricity.
UMH Material Handling
MFS+ Material Handling
Unimat 09-4x4/4S Continuous Action Plainline & S&C tamper
HOBCS-5 Comprising:
2 x RM 900-RT Ballast Cleaner
09-2X/CM Consolidation machine
PW Spoil System Power Vehicle
NB-PW New Ballast System Power Vehicle
20 x MFS-D Single Line Ballast Transfer System
8 x MFS-SB Swivel Belt Single Line Ballast Transfer System
2 x 09-2X DYN 2 sleeper continuous action tamper with DTS
09-3X DYN 3 sleeper continuous action tamper with DTS
USP5000 Regulator
USP6000 3rd Rail Regulator
Following Environmental Policy installed 408 Solar Panels, which generate enough electricity to power 360 homes. 97% waste to energy generates enough electricity to power 5,040 homes
MFS-D Single Line Ballast Transfer Systems
UMH Material Handling
MFS+ Material Handling
8 x 69.70 UK MMS Mobile Maintenance System
Implementation of Corporate Responsibility Statement (CSR)
Unimat 09-4x4/4S Continuous Action Plainline & S&C tamper
08-275 NX S&C Tamper
ISO 18001 achieved
RM-90-IR Cleaner
Celebration of 50 years in the UK
09-3X DYN 3 sleeper continuous action tampers with DTS
08-4x4/4S-RT Tampers P&C
USP 5000 RT Regulators
09-CM Dynamic RT Plain Line Tamper & DTS
09-2X-IR Tamper Plain Line
VM80 Cleaners
ISO 14001 achieved
HOBCS-4 Comprising
36 x MFS-D Material Handling
2 x RM 900-RT Ballast Cleaner
PW-RT Power Vehicle
NPW-RT Material Handling
8 x MFS-SB Swivel Belt Single Line Ballast Transfer System
08-4X4/4S-IR Tamper Universal
Main Workshop further Extended to cater for large machines
08-275/4ZW Metro Tamper
08-4x4/4S-RT Tamper P&C
09-3X DYN 3 sleeper continuous action tamper with DTS
DTS 62N Track Stabilizer
USP 5000 RT Regulator
RM90 Ballast Cleaner
AFM2000 RT Ballast Finishing Machine
HOBC Contracts commence.
ISO 9001 achieved
09-3X DYN 3 sleeper continuous action tamper with DTS
EM-SAT 100 RT Geometry Cars
RM900 Ballast Cleaner
Fully Integrated IT system introduced
USP5000 RT Regulator
Series 3 MFS Fleet with Power Wagons
Network Rail take over national rail network from Railtrack.
UFM160 High Speed Measuring Car
Compact Tampers 08 4X4/C100
08-2X Tamper
Series 2 GWS75
Re-engineering of three Underground tampers over 5 years
RM95 Ballast Cleaner
09-3X 3 sleeper continuous action tamper
Series 2 MFS Fleet
Compact Tampers 08 4X4/C80
08-16(32) Tamper
APT500L Flash Butt Welding Machine
“RT” machine delivery begins, with major customers now requesting maintenance contract packages
RT Series 08 and 09 Tampers (08-16, 08-32, 09-32, 08 4X4/4S)
GWS75 Mini Tampers
New “RT” Series machines developed and orders placed. New VAB approvals standards introduced by Railtrack fundamentally change machine acceptance processes.
MFS/NFS Ballast Handling Wagons with Power Wagons
Major refits of 07s commenced to extend life during privatisation process
Maintenance Contract pilot completed with excellent results.
Agency established for sister company Robel.
08 16-SP4 Tamper
Diversification during Rail Privatisation – Major contract for London Underground rolling stock.
SSP500 Regulator
Maintenance Contract Pilot with BR Southern Region
Dynamic Track Stabiliser Type DGS 62N
Series 4 GP-TRAMM’S
08-16/90 Tamper
Production of fleet of G P Trams begins at West Ealing.
08-275 Tampers
09 CSM Continuous Action Tampers
SCPV 14, PV5 Special OLE Machines.
Long Welded Rail Trains
Track and Services Car TASC
Rail Mounted Excavator Type EPV 360
General Purpose Crane type GPC 38
Major workshop extension.
Production of first Stoneblower PBI 84
Stoneblower Type PBI 84
Rail joint Treatment System STRAIT
Design Lining System DRIVER
General Purpose Track Maintenance Machine Type GP-TRAMM
Single Line Ballast Cleaning Skip System
Rail Profiler Type RPM 100
Rail Changer Type RCM 100
Handing over to BR of 500th Plasser machine delivered within UK.
Dynamic Track Stabiliser Type DGS 32N
Twin Jib Track Layer Type TJC 60
Ballast Cleaner Type RM74
Double Head Tamper Type MU 07-32
Automatic Design Lining System Type DLT
General Purpose Crane Type GPC 72
Commencement of machine production
New Technical Centre and Design Office.
Lifting and Slewing Machine Type HGR 230
Self-Propelled Trolley Type OBW 8
Handing of 300th Plasser machine to British Rail.
Ballast Regulator Type USP 5000 C
Switch and Crossing Tamper Type PLM 07-275
Ballast Regulator Type USP 4000 C
Tamper Type MU 07-16
Extension of stores and machine shop.
Joint Tamper Type UJT 16
Continuous Liner Type AL 250
Major extension, doubling workshop floor area.
Installation of Stock Control computer.
Move to former Civil Engineers workshop at West Ealing following extensive adaptations.
Combined Tamper/Liner Type UT 06-16 CTM
Crib and Shoulder Consolidator Type VDM 800 U
Combined Tamper/Liner Type 06-32 SLC
Ballast Regulator Type USP 3000 C
Double Head Tamper Type DUOMATIC 06-32
Switch and Crossing Tamper Type PLM 275
Co-operation with Rolls Royce, Shrewsbury, regarding machine production.
Ballast Cleaner Type RM62
First Tamper Type VKR 05E
Liner Type AL 203
First Tamper Type VKR 04
Formation of company with office in London and workshop/stores in Northampton.
Lifting/Slewing Machine Type HM 300 ST
Shoulder Ballast Cleaner Type SV 52
Tamper Type VKR 03
Tamper Type VKR 01